Corridor Study (141)
Parking Lot (149)
| Parking Lot |
| Parking Lot Access Rd |
| Other |
CIP Project Points (Active) (68)
CIP Project Lines (Active) (69)
CIP Project Polys (Active) (70)
CIP Project Points (OnHold) (72)
CIP Project Lines (OnHold) (73)
CIP Project Polys (OnHold) (74)
CIP Project Points (Completed) (76)
CIP Project Lines (Completed) (77)
CIP Project Polys (Completed) (78)
CIP Budget Book Points (80)
CIP Budget Book Lines (81)
CIP Budget Book Polys (82)
Reclaim Backflow Device (1)
Reclaim Manholes (2)
Reclaim Meters (3)
| Operational |
| Non Operational |
Reclaim Sampling Station (143)
Reclaim Valve - Active (4)
| CHANDLER |
| OCA / OMG |
| PRIVATE |
| OTHER |
Reclaim Valve - Other Status (148)
| CHANDLER |
| OCA / OMG |
| PRIVATE |
| OTHER |
Large Turnout (5)
Small Turnout (6)
| SMALL_TURNOUT |
| <all other values> |
Pumps (7)
Reclaim Wet Well (8)
Reclaim Fittings (9)
Reclaim Laterals (114)
| Active |
| Non-active or Unknown |
Active (11)
| CHANDLER |
| OCA / OMG |
| PRIVATE |
| OTHER |
Inactive (12)
Unknown or null (13)
Alleys Without Trash Pickup (135)
Storm Cleanout (51)
Storm Drain Manhole (52)
| Active |
| Non Active |
Drywell (53)
Catchbasin (54)
Scupper (55)
Bubbler Box (56)
Collection Vault (57)
Underground Retention (58)
Spillway Line (59)
Storm Water Mains (60)
| Active |
| Not Active |
Equalizer Pipe (61)
Retention Basin (62)
SWS.MS4_POLY (63)
Street Seal Coat Projects (64)
| ACRYLIC_SEAL |
| CRACK_SEAL_ALL |
| CRACK_SEAL_ONLY |
| MICRO_SEAL |
| SLURRY_SEAL |
| SLURRY_SEAL_2 |
| TRMSS |
| <all other values> |
Street Rehab Projects (65)
| ASPHALT_CAP |
| CONCRETE |
| HOT_IN_PLACE |
| MILL_INLAY |
| <all other values> |
Street Alley & Shoulder PM10 Projects (66)
Ramps (122)
| 0 |
| 1 - 25 |
| 26 - 50 |
| 51 - 100 |
Depressed Curb Driveways (123)
| 0 |
| 1 - 25 |
| 26 - 50 |
| 51 - 100 |
SIDEWALK (124)
| 0 |
| 1 - 25 |
| 26 - 50 |
| 51 - 100 |
NO SIDEWALK (125)
EDITED Ramps (127)
| FIXED |
| IN_PROGRESS |
EDITED Depressed Curb Driveways (128)
| FIXED |
| IN_PROGRESS |
EDITED SIDEWALK (129)
| FIXED |
| IN_PROGRESS |
EDITED NO SIDEWALK (130)
| FIXED |
| IN_PROGRESS |
Non-Contract Landscape (116)
| Retention Basin |
| Right of Way |
Contract Landscape (117)
| Contract Pavers |
| Contract Landscape |
Private/Other Street Centerline (95)
| Private / Non-dedicated / Other |
Alley Wall (152)
Autoscope Location (86)
Sign (87)
| New |
| Active |
| Relocated |
| Out of Service |
Pullbox (88)
TC Cabinet (89)
Vault (90)
Street Light (91)
Signalized Intersection (92)
Existing Base Fiber Runs (93)
Tan Fiber (94)
Sewer Cleanouts (36)
Sewer Interceptor (115)
Sewer Manholes (37)
| ACTIVE |
| UNKNOWN |
| <all other values> |
Air Release Valve (139)
Control Valve (38)
Liftstation (39)
Sewer Treatment Plant (40)
Sewer Fitting (41)
Sewer Service (119)
| Active |
| Non-active or Unknown |
Sewer Main Line (136)
| Active |
| Active - Town of Gilbert |
| Future |
| Abandoned/Inactive |
| Unknown |
| Other |
Misc Structure (48)
Sewer Modeling Point (49)
Water Meter (15)
| Operational |
| Non-Opperational |
Water Mains Active (17)
| TRANSMISSION |
| PRODUCTION |
| <all other values> |
Water Mains Non-COC (18)
Water Main Risk (146)
| Lowest Risk |
| Lower Risk |
| Moderate Risk |
| Higher Risk |
| Highest Risk |
Abandoned (19)
Pulled (20)
Service Lateral (21)
| ACTIVE |
| NON-ACTIVE |
Hydrant (22)
| ACTIVE |
| NON-ACTIVE |
Active System Valve (23)
| ARV |
| BLOWOFF |
| PERMASEAL |
| STANDARD |
Water Control Valve (150)
Active Backflow Device (26)
Fitting (27)
Water Manhole (28)
| <all other values> |
Sampling Station (29)
| <all other values> |
Reservoir (30)
Well (31)
Pump Station (32)
Water Production Facility (33)
| <all other values> |
Utility Service OCL (142)
WATER PRESSURE ZONES (151)
| 1 |
| 2 |
Historical Water Systems (34)
Roosevelt Water Conservation District (144)
Approved Water Conservation Rebate (137)
| New Home Xeriscape (NHR) |
| Landscape Conversion (LCR) |
| Controller (SCR) |
| Other |
|